The script for the panel uses a function based on Roland Snooks AttractorTools. This deforms a regular grid of points to, within a given distance, dencify around a line offset from the grid surface. This is an exercise in CAM strategies, but the script is intended to be modified and coupled with structural analysis, so to deform a facade in regards to structural stresses.
After simulation
Simulation of Finishing
Simulation of roughing
Tuesday, March 31, 2009
Saturday, March 28, 2009
ComponentWorkshop_With Dennis Dollens/Ernesto Bueno
Eme3 Exposition
The final design and construction of the EsArq pavilion for the Eme3 Exposition. The final design and construction was done within one week and the structure was at the CCCB museum for 3 days. The "Grotto" was well recived and got positive mentions in El Pais(20.03.09) and will be published in other magazines.
Monday, March 9, 2009
RhinoScripting course
Sunday, March 1, 2009
Eme3 Competition
Subscribe to:
Posts (Atom)